Light Steel Frame Construction Costs

A recent 2017 initial cost of construction comparison study documented the initial cost of six construction types in multi residential structures including conventional wood framing and flooring steel framing with cast in place concrete flooring concrete masonry with precast concrete flooring and precast concrete walls and floors.
Light steel frame construction costs. Reduced cost on average a steel home costs between 40 and 70 per square foot including the kit delivery windows doors foundation erection you will also need to factor in approx. Steel framing cost. The necessary costs you will encounter in order to compete your building can fluctuate even more drastically than the price of steel. Steel runs an average of 2 to 6 per square foot while wood is in the 1 to 5 per square foot range.
A steel frame house has an average cost between 9 50 and 11 per square foot meaning the total cost for a 2 000 square foot home falls between 19 000 and 22 000. Cost per sqft by steel frame building system steel frame building prices can also vary drastically from company to company depending on the company s buying power and the type of metal frame building the company supplies. A wood frame house has an average cost between 1 and 5 per square foot with overages between 15 and 20 percent waste. Labor costs for steel framing average around 3 per square foot.
Contact your contractor for specific details or consult our wood carpentry framing cost guide. An average commercial steel building costs between 16 and 20 per square foot including building package i beams purlins girts etc delivery foundation and the cost of construction. Futurecon is the south african leader in light steel frame construction with over 17 years experience working in both north america and southern africa. Wood framing cost.
30 cheaper than a traditional 2x4 wood building. Other articles we ve read on this topic claim you can count on 10 20 per square foot for the necessities like concrete erection and insulation but that range is hardly accurate. Reduced wastage lower logistical costs and reduced time of construction could offer cost savings of 15 or more compared with conventional building. Labor costs are similar at 5 to 10 per square foot though some contractors boast the ability to put steel together quicker cutting labor costs.